Alexandria Petroleum Company

Since 17 July 2020 At the “U-3000 Project’ , FGE was proud to provide its distinguished services , It was a vital unit revamping for Egypt regarding its productivity which avail through multiple site visits from the Ministry of Petroleum .’U-3000 Project’ at APC refinery , now operating at its optimal production rate of around 100,000 barrels per day (bbl/d) , saving $85 million annually .
We love to share this moment of success and pride with you all working in the Oil & Gas sector and all our dear clients .

FGE activities onsite included :

Pre-Commissioning / System Acceptance testing :

  • 25 Pumps each one with different specifications and purpose.
  • 17 Heat Exchanger and Coolers .
  • 10 Towers and Vessels .
  • Bringing the drainage system to service .
  • Steam Blowing.

 

* Commissioning :

  •  Activating of all Utilities .
  • Instrumentation for : 40 flow transmitter , 46 valves & 33 switches and many other instrumentation .
  •  Functional performance in all modes and system conditions.
  •  Functional testing of Rotating Equipment / Electric Motors.
  •  Flange Management .
  • Gross leak Test & Commissioning leak test .
  • Nitrogen Purging ( System Inerting)
This success was the product of team effort , diligence & thoroughness . We would like to thank UNISERVE & BGSES
Our subcontractors and all our partners and witnesses to this preeminent achievement ;
EPROM , Egyptian General Petroleum Corporation (EGPC) & Alexandria Petroleum Company

 

 

Company Profile